I am having part of basement redone after flood damage. I would like to know a ball park figure for the following utilizing a 320 sq ft space.
Old paneling removed, old tile (wet underneath) removed. All hauled away by contractor. Replace with insulation and water-resistent dry wall; wood laminate floor (flooring at around 75.00 per sq ft). Install three doors in lieu of old paneling and panel doors. Paint dry wall all around. The figure I am looking for does not include materials as I am paying for them separately. I am interested in a labor figure.



